Home-building can be a String of Bad Decisions Combined with the Ignorant Expectation that Nothing Can Go Wrong

Home-building can be a String of Bad Decisions Combined with the Ignorant Expectation that Nothing Can Go Wrong

Home-building decisions should be made by informed thoughts, and a rational look into the future to see the outcome of a logical chain of events. Unfortunately the norm, for pros and novices alike, skips the part about information, rational thinking and logic. In this article, a ‘builder’ constructed, for himself, a fatally flawed house which immediately began to collapse because of his bad decisions.

Below: That’s my foot on a ‘break’ that runs all the way across the house. The new slab is broken in half, here. One of the builder’s bad decisions was to leave out the wire mesh that helps prevent such things. The next picture (below next) shows the wire mesh still rolled up and sitting on the slab in which it was supposed to be installed. That’s it on the left end of the photo.

This image has an empty alt attribute; its file name is IMG_3756.JPG
Broken Slab
This image has an empty alt attribute; its file name is ThomasSusanWireMeshSlab.png
Wire Mesh Left Out of Slab. Oops.

Below: a rafter is notched to fit over a ceiling joist, which is also notched. This has already triggered a structural collapse. The ‘electrician’ (also the same builder) threaded a live wire in the gap between the rafter and joist to save the time of drilling a hole. But as soon as the rafter and joist settle and pinch together, they will bite the wire and cut its yellow sheathing. This will cause a short circuit which will lead to a fire which will burn down the house.

This image has an empty alt attribute; its file name is IMG_3712.JPG
Notch lumber. Collapse Structure. Break wire. Short circuit. Cause Fire. Burn house down.

Below: the ceiling joists at the top of the picture appear to be curved downward in the middle. This is not a camera illusion. Another of the builder’s bad decisions was to use lumber too small to span the room’s ceiling. So, it’s collapsing.

This image has an empty alt attribute; its file name is IMG_3755.JPG
Downward-curved ceiling joists are not an illusion.

For an all-in-one treat, the picture below has a lot to offer. You’re looking at an exterior wall of the house and the interior ceiling joists. The curved board is a grossly undersized joist. The 2×6 lumber is intended to span no more than thirteen feet, but the builder decided to use it to span thirty-two feet. Also, the wall on the right is falling outward, away from the house, so it is pulling on the framing for the ceiling, which is distorting the structure. It isn’t shown, but the roof is also buckling because of the combined failure of the wall and ceiling joists.

This image has an empty alt attribute; its file name is IMG_3723-768x1024.jpg
All-at-once failure of the wall, ceiling and roof.

I’m not sure if this is a stand-alone article, or the beginning of a whole series of articles and videos.

Stand by. -AB-  

Buy a subscription

Buy a subscription

just for yourself.

Give a subscription

Give a subscription

to someone

who might need help

building or remodeling.

Tell a friend about this website

Tell someone

who needs to see HBT.

Andy Bozeman

Follow Home Building Timeline all the way home.

Step By Step

Everyone-Everything-Right Place-Right Time